Southwest Cape and the Gulf-access canals
The southwest is the established part of the city, with City water, sewer and irrigation at the street and canals that lead to the river and the Gulf. On a canal lot, the seawall comes first: the City does not allow the home to be occupied until the seawall is installed and inspected, and a seawall can be deferred past the building permit only when a vacant lot sits beside the construction site.